Cabinets

The cabinets were delivered today, and the boys are busy sorting and carrying.  Most of the base cabs will be in the room when they are done, the wall hung cabs may spend a while in the garage.We will have two tall ones along the west wall.  The doors are off to make them lighter for the trip from the truck.  Our stand up freezer will slot into the corner.There will be an island in the middle.  The sink will be under the window on the left.  The new range will go on the far wall, the fridge goes on the left wall just this side of the sink with the dishwasher between them.

Advertisements